Project 1 Videos

Conceptual Designs

Design is underway for several components of Project 1. Click below for video "walk-throughs" of the conceptual designs.

  • South Cafeteria (work begins June 2020): Current cafeteria will be demolished and a new foundation built to support a two-story Student Resource Center above the cafeteria. An elevator in the the northeast corner will provide access to all floors.
  • Student Resource Center (SRC) (work begins June 2020): Located on the two floors above the South Cafeteria, the SRC will be home to the Tutoring Center, Makerspace, Library, enclosed classroom/study areas, and offices. An elevator in the the northeast corner will provide access to all floors.
  • Main Entrance and Student Commons (work begins summer 2021): The Main Entrance will be larger, lighter, and more welcoming (video shows it without finishes such as carpet, trims, etc.), while the Student Commons will provide an inviting space for students to socialize, do homework, and collaborate. It also incoporates a large limestone piece that was part of the original entrance more than 100 years ago.